Control

Your whole quality system, under control.

Control runs your quality manual, policies, SOPs, work instructions and forms as controlled documents, with review, electronic signatures and a full audit trail.

Thirty minutes. Bring one piece of equipment.

  • QM-001Revision 4Quality manualEffective
  • SOP-014Revision 3Equipment cleaning and disinfectionRevision 2 stays in effect until thenScheduled
  • SOP-021Revision 1Analytical balance calibrationIn review
  • WI-008Revision 2Autoclave loadingEffective
  • FRM-003Revision 5Equipment logbookEffective

Pipette verification v2.docx imported as SOP-030, revision 2

Reviewed and signed, with Quality last.

Reviewers comment on, approve and sign controlled documents in the document editor. The Quality owner signs last, and every revision stays on file with who approved it and when.

Effective on the date you set.

A finalized revision takes effect on a scheduled date, 14 days out by default, so people can be trained before it applies. Until then, the revision it replaces stays in effect.

Your house format, every time.

Organization templates hold your header, your sections and your standard wording. A new document starts from its template, and the parts you locked stay locked.

Bring the documents you already have.

Import your quality documents from Word or PDF. ValDoc copies the text exactly and proposes each document's ID, title and class, so the register is complete from the first day.

Pipette verification v2.docx imported as SOP-030, revision 2

See your own equipment in ValDoc.

Bring one piece of equipment, or one you plan to buy, and we’ll walk it through ValDoc with you, from its intended use to the signed record.

Thirty minutes. Bring one piece of equipment.