Transport system validation: URS and IQ/OQ

Validating a transport system means writing a URS for its intended use, assessing the risks, then running an IOQ. The IQ confirms it was installed as specified, and the OQ proves it performs, with tests such as Temperature Performance Study (Summer Profile), Temperature Performance Study (Winter Profile) and Maximum Duration / Hold Time Study.

An insulated shipper, cold-chain container, dry shipper or other packaging that holds conditions while material is moved. ValDoc drafts the URS, risk assessment, IOQ and SOP from the intended use you state, runs the IOQ at the bench and keeps its maintenance on the same record. It does not draft the PQ, which depends on your process. You write that as your own Protocol.

Last updated

Thirty minutes. Bring one piece of equipment.

What the URS specifies

ValDoc's URS for a transport system starts from 16 requirements in 7 groups. You choose which apply and set each value. A few from each group are below.

Operating parameters1

  • Shipment temperature condition

Performance1

  • Qualified temperature hold time

Capacity & dimensions4

  • Payload capacity
  • External dimensions
  • Empty weight
  • and 1 more

Design & construction4

  • Transport type
  • Cooling method
  • Insulation type
  • and 1 more

Alarms & monitoring4

  • Data logger included
  • External monitoring capability
  • Alarm capability
  • and 1 more

Operating environment1

  • Storage condition when not in use

Maintenance & serviceability1

  • Preconditioning required

What the IOQ tests

ValDoc's starting protocol has 18 test cases: 9 installation and 9 operational. A few from each phase are below, and your team reviews and edits every test before the protocol is approved.

Installation qualification9

  • Settings Verification
  • Equipment Condition Check
  • System Information & Nameplate Verification
  • and 6 more

Operational qualification9

  • Temperature Performance Study (Summer Profile)
  • Temperature Performance Study (Winter Profile)
  • Maximum Duration / Hold Time Study
  • and 6 more

Regulations that can apply

ValDoc's library holds 8 regulations from US and EU sources that can apply to a transport system URS, including 21 CFR Part 11, EudraLex Volume 4, Annex 11 and EudraLex Volume 4, Annex 15. Which of them apply depends on its intended use.

Every regulation in ValDoc's library

Maintenance and calibration

Maintain proposes 3 plans for a transport system, and you confirm each cadence against the manual and your SOP. Each unit gets its own schedule and history, on the same record as its qualification. Maintain also offers 4 plans any family can use, such as Electrical Safety Inspection.

  • PM

    Every 1 year

    Dry Shipper Static Hold Time Verification

  • PM

    Every 6 months

    Reusable Passive Shipper Integrity Inspection

  • PM

    Every 1 year

    Active Shipper Refrigeration and Battery Preventive Maintenance